![Grifo SEP 40 User Manual Download Page 75](http://html1.mh-extra.com/html/grifo/sep-40/sep-40_user-manual_2264999075.webp)
ITALIAN TECHNOLOGY
grifo
®
Page 65
SEP 40 Rel. 3.10
ISP (IN-SYSTEM PROGRAMMING)
In-system programming allows programming and reprogramming of device positioned inside the
end system. Using a simple interface, the ISP programmer communicates serially with the device,
reprogramming nonvolatile memories on the chip. In-system programming eliminates the physical
removal of chips from the system. This will save time, and money, both during development in the
lab, and when updating the software or parameters in the field.
Target device is the device (microcontroller, PLD, etc…), which is to be in-system programmed.
Target system is the physical Printed Circuit Board (PCB) which contains the device to be in-system
programmed.
GENERAL RULES FOR IN-SYSTEM PROGRAMMING
Please refer to figure 5.
We recommend respect following rules to avoid damages to PC, ISP programmer, target device or
target system:
- Ensure common earth point for target system, ISP programmer and PC.
- For laptop or other PC which is not connected to common earth point: make hard - wired
connection from laptop to common earth point (for example use LPT or COM port D –
connector).
Any devices connected to target system must be connected to common earth point too.
During in-system programming you connect two electrical devices – ISP programmer and target
system. Unqualified connection can damage these devices.
NOTE: When you don’t keep below directions and you damage programmer during in-system
programming, it is damage of programmer by unqualified manipulation and is out of warranty.
1.
Turn off both devices – ISP programmer and target device.
2.
Assign same GND potential for all devices, e.g. connect GND of all devices by wire.
3.
Insert one connector of ISP cable to ISP programmer, turn on programmer and control
program.
4.
In control program select target device and operation options.
5.
Start action on target device (read, program).
6.
After direction of control program, connect other ISP cable connector to target system and turn
on it.
7.
After direction of control program, disconnect other ISP cable connector from target system
and turn off it.
8.
If you need another action on target device, you continue with step 5.
NOTE:
If target system use signals needed for ISP programming, it’s necessary separate them from target
device by appropriate resistors.
Summary of Contents for SEP 40
Page 2: ......
Page 15: ...ITALIAN TECHNOLOGY grifo Pagina 5 SEP 40 Rel 3 10 FIGURA 1 FOTO DEL SEP 40...
Page 19: ...ITALIAN TECHNOLOGY grifo Pagina 9 SEP 40 Rel 3 10 FIGURA 3 CONTENUTO DELLA CONFEZIONE...
Page 64: ...grifo ITALIAN TECHNOLOGY Pagina 54 SEP 40 Rel 3 10...
Page 69: ...ITALIAN TECHNOLOGY grifo Page 59 SEP 40 Rel 3 10 FIGURE 1 PHOTO OF PROGRAMMER SEP 40...
Page 73: ...ITALIAN TECHNOLOGY grifo Page 63 SEP 40 Rel 3 10 FIGURE 3 PACKAGE CONTENT...
Page 118: ...grifo ITALIAN TECHNOLOGY Page 108 SEP 40 Rel 3 10...