![Gree LSQWRF35VM/NaA-M Service Manual Download Page 41](http://html1.mh-extra.com/html/gree/lsqwrf35vm-naa-m/lsqwrf35vm-naa-m_service-manual_2260683041.webp)
37
Unit Installation
NOTE
Keep the purge valve of the water system open in order to drain the evaporator and condenser
completely.
3.4.2 Requirements on piping
The piping slope should meet design and construction regulations and the flexible pipe is not allowed
to be longer than 150mm.
Pipes which go through the dilatation joint and the settlement joint should be protected with the flexible
joint.
No matter which connection is used, welding, threaded connection or flange connection, the connection
joint can’t be in the wall, floor or sleeve pipe.
The riser pipe should be installed vertically. When the floor height is or less than 5m, a pipe clip
is required. When the floor height is or larger than 5m, at least 2 pipe clips should be required. The
installation height of the pipe clip is 1.8m. For the main riser pipe, it should be secured with the fixed
bolster to support the weight of the riser pipe.
See the
table below for the installation standards of the pipes.
Item
Allowable deviation
Inspection method
Straightness
DN≤100mm
2L‰, max.440mm
By the ruler, tape measurement
DN>100mm
3L‰, max.460mm
Verticality
25L‰, max.425mm
By the ruler, tape measurement
Interval of Parallel Pipes
15mm
By the ruler, tape measurement
Parallelism of Parallel Pipes
3mm
By the ruler, tape measurement
Piping flowchart
Check documents
and drawings
Check materials
Prefabricate pipes
Install hangers
and brackets
Install pipes
Take the pressure
test
Rinse pipes
Take the anti-corrosion
and insulation treatment
Take protective
measures to the
finished products
(1)
Check documents and drawings
1)
Check the process flow, construction procedures and quality requirements in accordance with
drawings and technical data.
2) Check the installation location, installation height, arrangement, and installation space of pipes in
accordance with equipment drawings and building drawings.
(2) Check materials
1) Before installation, check for the mode of the valves, clean them and then take the strength and
air-proof tests.
2)
Pipes should be cleaned with a steel brush or abrasive paper. After that, seal the pipe ends and
keep both the internal and external surface dry.
3)
Pipes should be painted twice with anti-rust paint without any curtaining and voids.
Summary of Contents for LSQWRF35VM/NaA-M
Page 5: ...1 Product Product...
Page 18: ...14 Unit Control Unit Control...
Page 29: ...25 Unit Installation Unit Installation...
Page 58: ...54 Unit Installation 3 5 7 Electric wiring digram 1 LSQWRF35VM NaA M...
Page 59: ...55 Unit Installation 2 LSQWRF60VM NaA M LSQWRF65VM NaA M...
Page 60: ...56 Unit Installation 3 LSQWRF35VM NhA M...
Page 61: ...57 Unit Installation 4 LSQWRF60VM NhA M...
Page 62: ...58 Unit Installation 5 LSQWRF130VM NhA M...
Page 63: ...59 Unit Installation...
Page 64: ...60 Unit Installation The electric wiring diagrams on the unit always prevail...