82
Test Operation, Troubleshooting and Maintenance
Replacement of the electric expansion valve
Note: check the whole system, pipelines and electric lines, cut off power supply and reclaim
refrigerant before replacement.
Steps
Image
Instructions
1. Reclaim
refrigerant and
remove the middle
panel.
• Cut off power supply of the unit.
•
Reclaim refrigerant.
•
Remove the middle panel.
2. Take out the
coils, pipe clamps
and rubber pads.
•
Take out coils.
• Loosen screws and take out pipe
clamps and rubber pads.
• Wrap the valve with wet cloth to
prevent the sliding block from being
burn out. In this case, care must be
taken to not let water enter the pipe.
3. Desolder
connection pipes.
•
Desolder connection pipes and then
disconnect them with the main body
of the valve.
•
Do charge nitrogen during
desoldering.
•
Protection measures should be
taken during soldering to prevent
surrounding objects from being burnt
out.
4. Take out the
main body.
Take out the main body of the electric
expansion valve.
Summary of Contents for LSQWRF35VM/NaA-M
Page 5: ...1 Product Product...
Page 18: ...14 Unit Control Unit Control...
Page 29: ...25 Unit Installation Unit Installation...
Page 58: ...54 Unit Installation 3 5 7 Electric wiring digram 1 LSQWRF35VM NaA M...
Page 59: ...55 Unit Installation 2 LSQWRF60VM NaA M LSQWRF65VM NaA M...
Page 60: ...56 Unit Installation 3 LSQWRF35VM NhA M...
Page 61: ...57 Unit Installation 4 LSQWRF60VM NhA M...
Page 62: ...58 Unit Installation 5 LSQWRF130VM NhA M...
Page 63: ...59 Unit Installation...
Page 64: ...60 Unit Installation The electric wiring diagrams on the unit always prevail...