To record the installation and commissioning of the unit, all the following documents need to be
prepared: minutes of the pre-commissioning scheme determining meeting, commissioning personnel
record form, pre-commissioning checklist, commissioning data record form, and commissioning report.
Minutes of the commissioning scheme determining meeting:
Minutes of the commissioning scheme determining meeting for XXX project:
Theme: xxx
Date: xxx
Place: xxx
Participants: xxx
Details: xxx
1
2
3
Checklist of the commissioning system appearance:
Checklist of the equipment appearance of xxx air-conditioning project
Item
Defect
Inspector
Time
Refrigerating
system
Outdoor unit
appearance
Indoor unit
appearance
Copper pipe
insulation
Drainage system
Condensate
water pipe
insulation
Electrical system
Power cable
diameter
Power cable
layout
Air circuit
breaker
Communication
system
Communication
cable material
Communication
cable
connection