Gree GMV6 DC Inverter VRF Units Service Manual
38
Step 5:
During commissioning, multi-functional debugger shows the current process (step). In steps
3, 4, 8, and 12, click Confirm to go to the next step. In step 10, click Skip or Back. In steps 3, 4, 5, 6, and
7, you can view the details.
Step 6:
After the commissioning, the outdoor unit displays "01 AC" or "AH OF" (or a fault, if any, or
"on" when the unit is started up).
After the product is used, the cable connection of the air-conditioner unit must be recovered.
Otherwise, the actual use will be affected.
3.2.6 After Commissioning
Organize and save the data. Make complete and detailed records of exceptions and corresponding
solutions in the commissioning process for future maintenance and query. Finally, export the
commissioning report and hand it over to the user.
After the commissioning, instruct the user of the following precautions:
When the outdoor unit is continuously powered off for more than 24 hours, it must be warmed up for
at least 2 hours to avoid damage to the compressor.