![Gorilla Treasure Trove II Assembly Manual Download Page 8](http://html1.mh-extra.com/html/gorilla/treasure-trove-ii/treasure-trove-ii_assembly-manual_2246352008.webp)
STEP 8: LEVELING THE PLAY SET AND LAGS
1: INSTALL LAG SCREWS ONLY IN THE FOUR 2 X 6 BOARDS AT DECK HEIGHT AT THIS TIME.
SQUARE EACH OF THESE FOUR BOARDS TO THE CORNER POSTS AND THEN INSTALL THE LAG
SCREWS. THIS IS TO MAKE THE STRUCTURE RIDGID FOR THE LEVELING AND SQUARING
PROCESS.
2: PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT
OF THE MANUAL TO LEVEL AND SQUARE THE STRUCTURE. HAVE AN ASSISTANT HELP YOU
LIFT THE FRAME AS REQUIRED.
DO NOT
INSTALL REMAINING LAG SCREWS UNTIL AFTER THE
FRAME HAS BEEN LEVELED AND SQUARED.
3: ONCE THE FRAME IS LEVEL, SQUARE AND SET INTO POSITION; GO BACK AND INSERT
THE 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS IN ALL OF THE REMAINING HOLES OF
THE 2 X 6 PARTS ON THE FRONT, SIDES AND REAR OF THE PLAY SET. NOTE: THERE WILL NOT
BE ANY PREDRILLED HOLES IN THE CORNER POSTS FOR THE LAG SCREWS.
5/16" WASHER
LAG SCREW
RIGHT SIDE FRAME
FRONT OF FORT
***IMPORTANT***
SQUARE THESE FOUR BOARDS TO THE CORNER
POSTS , THEN INSTALL LAG SCREWS AND WASHERS
FIRST. THEN LEVEL/SQUARE THE FRAME. FINALLY,
INSTALL LAG SCREWS IN THE REMAINING
2 X 6 BOARDS.
5/16" X 3-1/2"
LEFT SIDE FRAME
53
Summary of Contents for Treasure Trove II
Page 73: ...PART 2 CLATTER BRIDGE ASSEMBLY 118 ...
Page 99: ...APPENDIX 144 ...