SWING BEAM SIDE OF FORT
SWING BEAM WITH IRON DUCTILE SWING HANGERS ATTACHED
END WTIH 2 HOLES
STEP 48: REST SWING BEAM ON FORT
1: REST THE SWING BEAM ASSEMBLY ON TOP OF THE UPPER RAILING BOARDS OF THE
FORT.
2: THE END OF THE SWING BEAM WITH 2 HOLES SHOULD OVERHANG THE SWING BEAM
SIDE OF THE FORT. IN THE NEXT STEP YOU WILL ATTACH THE SWING BEAM LEGS ONTO THIS
END OF THE SWING BEAM.
93
Summary of Contents for Treasure Trove II
Page 73: ...PART 2 CLATTER BRIDGE ASSEMBLY 118 ...
Page 99: ...APPENDIX 144 ...