![Gorilla Treasure Trove II Assembly Manual Download Page 24](http://html1.mh-extra.com/html/gorilla/treasure-trove-ii/treasure-trove-ii_assembly-manual_2246352024.webp)
STEP 24: UPPER LEVEL - RAILING & UNDER DECK SUPPORT
1: PLACE THE 2 X 4 X 70" UPPER LEVEL STEPS/RAILING BOARD (3 HOLES ON CENTER) AT
THE TOP OF THE REAR CORNER POSTS. THIS BOARD WILL GET ATTACHED TO THE 2ND
HOLE DOWN FROM THE TOP OF THE POSTS. THE T-NUT FOR THIS BOARD SHOULD BE ON
THE INSIDE OF EACH POST ALREADY. FASTEN THE UPPER LEVEL RAILING BOARD TO THE
REAR CORNER POSTS WITH 5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS.
2: PLACE THE 2 X 6 X 70" SANDBOX BOARD (OFFSET UP) AT THE BOTTOM OF THE REAR
CORNER POSTS. FASTEN THE TOP HOLES IN THE SANDBOX BOARD TO THE REAR CORNER
POSTS WITH 5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS.
3: PLACE THE 4 X 4 X 70" UPPER LEVEL UNDER DECK SUPPORT DIRECTLY UNDERNEATH THE
UPPER LEVEL DECK SUPPORTS. ATTACH THE UNDER DECK SUPPORT TO THE REAR CORNER
POSTS WITH 3/8" X 5" LAG SCREWS AND 3/8" WASHERS.
4-1/2"
HEX BOLT
HEX BOLT
5/16" WASHER
SANDBOX
4-1/2"
BOARD
UNDER DECK SUPPORT
UPPER LEVEL STEPS/RAILING BOARD
5/16" X
(3 HOLES ON CENTER)
4 X 4 X 70" UPPER LEVEL
2 X 4 X 70"
(OFFSET UP)
5/16"
WASHER
2 X 6 X 70"
5/16" X
3/8"
WASHER
3/8" X 5"
LAG SCREW
69
Summary of Contents for Treasure Trove II
Page 73: ...PART 2 CLATTER BRIDGE ASSEMBLY 118 ...
Page 99: ...APPENDIX 144 ...