
STEP 26: MOUNT SWING BEAM TO SWING BEAM LEGS
1: FASTEN THE SWING BEAM TO THE SWING BEAM BRACKET USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS ON
TOP OF THE SWING BEAM, AND 3/8" LOCK NUTS WITH 3/8" WASHERS FROM UNDERNEATH.
2: USE A 3/8 X 3-1/2" LAG SCREW WITH 3/8" WASHER FOR THE HOLE IN THE CENTER OF THE SWING BEAM BRACKET.
3: PLACE A BOLT CAP OVER ANY EXPOSED THREADS.
BOLT CAP
7" CARRIAGE BOLT
TORQUE WASHER
3/8" WASHER
3/8" LOCK NUT
3/8 X 3-1/2"
LAG SCREW
79
Summary of Contents for Malibu Pioneer Peak 1500DWR
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 125: ...PART 2 CLATTER BRIDGE ASSEMBLY 117...
Page 160: ...APPENDIX 152...