flexiCal
net
OPERATION
3-31
3.6.1 ‘General’ Tab
To save any preference change then close window, select
.
To reject any preference change and return to factory default
settings, select
.
Note: Previously made changes will also be discarded.
3.6.1.1 Cal Due (Gasurveyor 500 series only)
Following calibration, the calibration due (Cal Due) date is
normally set as one year from present date (i.e. ‘365’ value in
window).
This preference can be replaced with a time period, in days,
ranging from 0 days to 365 days.
Use
to select number of days required.
3.6.1.2 Stop On Zero Failure
By default, stopping the test / calibration process due to an
instrument zero failure is disabled.
To override this setting, i.e. enable feature, place a
in the
‘Stop On Zero Failure’ box.
3.6.1.3 Stop On First Span Failure
By default, stopping the test / calibration process due to an
instrument span failure is disabled.
To override this setting, i.e. enable feature, place a
in the
‘Stop On First Span Failure’ box.
Summary of Contents for GDUnet
Page 1: ...User Handbook Gas Measurement Instruments Ltd...
Page 6: ...USER HANDBOOK iv...
Page 14: ...USER HANDBOOK xii...
Page 96: ...USER HANDBOOK 5 14...
Page 106: ...6 10 USER HANDBOOK...
Page 115: ...7 9 STANDALONE MODE Fig 7 13 Calibration Certificate...
Page 121: ......