7-4
USER HANDBOOK
7.2
UPLOAD TEST / CALIBRATION SETUP
FILES TO GDU
net
Ensure the GDU
net
is powered on and the start up sequence is
complete. Unlock the front panel door and insert the
USB memory
stick into the USB port as illustrated in Fig. 7-6.
Fig. 7-6 GDUnet USB Port
The test and calibration setup files will automatically be uploaded
to the GDU
net
. During the upload process, the front panel
PASS
and FAIL LED’s will alternate until the upload is complete. The
USB memory stick can now be removed and the front panel
door locked.
Warning: If there is an error during the file upload process,
the ‘Test in Progress’ LED will start flashing. The
light will continue to flash when the USB memory
stick has been removed and will not switch off
until the USB memory stick is reinserted (file
upload process starts again), or, an instrument
is placed on the GDU
net
(test cycle begins).
Summary of Contents for GDUnet
Page 1: ...User Handbook Gas Measurement Instruments Ltd...
Page 6: ...USER HANDBOOK iv...
Page 14: ...USER HANDBOOK xii...
Page 96: ...USER HANDBOOK 5 14...
Page 106: ...6 10 USER HANDBOOK...
Page 115: ...7 9 STANDALONE MODE Fig 7 13 Calibration Certificate...
Page 121: ......