2 / 2
6.8.
0
REPLACEMENT OF THE SUPPORTS
AND SHAFTS OF THE BLADES
General informations:
---
Related topics:
Special tools
Removing the blades
Removal of the cutting deck
[
Removal of blade control belt
[
Removal of blade connection belt
[
Tightening torques
2
Screws for plate fastening ................. 30 ÷ 35 Nm
5
Nuts for flange support fastening ..... 25 ÷ 30 Nm
11
10
9
8
12
13
4
14
4
15
After having removed the key (8), the snap ring (9),
and the dust cover (10) the bearing (11) splined onto
the shaft can be removed using a normal extractor,
taking care to close up the threaded hole (12) with a
screw to prevent the point of the extractor from dam-
aging the thread.
The second bearing still in place must be removed by
hitting it from the inside of the flange using a 12 ÷ 15
mm diameter round bar (13).
On assembling, first put the shaft into the hole of the
lower bearing and insert this into the support. Fit on
the upper bearing and, using the special buffer (14)
which works on the inner ring
, hit it squarely with a
mallet until the bearing is fully driven home.
Reassemble the flange supports onto the deck,
fully
tightening the nuts
(5) and checking that the sup-
port with the shaft is longer than that on the left.
On reassembly of the plate (3),
the holes lined up
with the support axles should perfectly match
with the centring step
(15) on the upper part of
each support.
• Reassemble the blades.
• Reassemble the blade connection belt.
• Reassemble the blade control belt.
MODEL YEAR 2016
N…102 Hy
N…102
WORKSHOP MANUAL
WORKSHOP MANUAL
BACK