67
Server
Gigaset T300 PRO / Gigaset T500 PRO / EN Master / A31008-M2212-R102-1y-7619 / admin_administration.fm / 02.12.2010
V
e
rsion 2, 06.0
8
.2010
Step 4: Finish backup
This starts the data backup and a progress bar for the process is opened. If the process reaches
100%, then the data backup has been completed successfully.
In addition to the storage location specified in Step 3, the backup file can be downloaded to be
saved on the local computer.
Please note
If the preferences have been adopted, it does not mean they have been saved perma-
nently. To do so, you must click on
Apply
or
Save
in the
List of backup schedules
.