Powerturn
38
Installation
7.18 Installing the integrated closing sequence selector
See additional installation instructions mat. no. 154872.
7.19 Entries on the identification plate
Powerturn
153065
Swing door operator
Input
Output
230 V
50 Hz 0.84 A / 200 W
24 V
1.2 A / 30 W
50 °C
-15 °C
Dry areas only
IP30
Serial No.
000000000000
DIN18650-1:2010-06 1 | 3 | 1 | 0 | _ _ _ | _ | _ _ _ _ | 2
IS with ID 153065/166017, 154838 / IS/TS with 164013 or 164012
28/2021
1
Identification plate
2
“Ü” symbol
The EN class range for rail installation is EN 4-6.
The EN class range for link arm installation is EN 6-7.
à
The entries are obligatory.
Entries on the identification plate (in compliance with DIN 18650-1:2010-06)
Powerturn
153065
Swing door operator
Input
Output
230 V
50 Hz 0.84 A / 200 W
24 V
1.2 A / 30 W
50 °C
-15 °C
Dry areas only
IP30
Serial No.
000000000000
DIN18650-1:2010-06 1 | 3 | 1 | 0 | _ _ _ | _ | _ _ _ _ | 2
IS with ID 153065/166017, 154838 / IS/TS with 164013 or 164012
28/2021
1
2
3
4
6
8
5
7
A
B
C
D
E
F
a
Drive type (first character)
1
Swing door drive (classified in the factory)
s
Durability of the drive (second character)
3
1,000,000 test cycles, with at least 4,000 cycles/24 h (classified in the factory)
d
Type of door design (third character)
1
Swing door (classified in the factory)
f
Suitability as a fire protection door (fourth character)
0
Not suitable as fire protection door
1
Suitable as smoke protection door
2
Suitable as fire protection door
3
Suitable as fire and smoke protection door
Note: Only one class may be entered. If the Powerturn rather than the Powerturn F is installed, the digit “0”
must always be entered!
Summary of Contents for Powerturn
Page 50: ...Powerturn 50 Powerturn installation check list...
Page 51: ...Powerturn 51 Powerturn installation check list...
Page 52: ...Powerturn 52 Powerturn installation check list...
Page 53: ...Powerturn 53 Powerturn installation check list...
Page 54: ...Powerturn 54 Powerturn installation check list...
Page 55: ...Powerturn 55 Powerturn installation check list...