Powerturn
11
Product description
Type of installation
Dimension
Powerturn
Powerturn F
Door installation hinge side rail
Reveal depth LT [mm]
0–50
Door overlap Ü [mm]
0–30
Max. door opening angle TÖW [°]
approx. 126
3)
Standard roller guide rail L = [mm]
738
Lever
L = [mm]
330
Hinge clearance [mm]
220
EN class /
Closing torque (at 0–4°) [Nm]
4–6 / 70 (78)
6)
Door installation opposite hinge side rail
Reveal depth LT [mm]
0
Max. door leaf thickness [mm]
100
7)
Max. door opening angle TÖW [°]
approx. 104
Standard roller guide rail L = [mm]
738
Lever
L = [mm]
450
Hinge clearance [mm]
220
EN class /
Closing torque (at 0–4°) [Nm]
4–6 / 59 (62)
6)
Door installation hinge side link arm
Reveal depth LT [mm]
0
Door overlap Ü [mm]
0–30
0
Hinge clearance [mm]
220
Max. door opening angle TÖW [°]
approx. 115
EN class /
Closing torque (at 0–4°) [Nm]
6–7 / 124 (128)
6)
Transom installation opposite hinge side link arm
Standard reveal depth LT [mm]
up to 510
up to 300
Reveal depths LT with link arm
adapter for sensor link arm [mm]
up to 560
up to 300
Max. door leaf thickness [mm]
150
Max. door opening angle TÖW [°]
approx. 110–135
2,3,4)
Hinge clearance [mm]
190
EN class /
Closing torque (at 0–4°) [Nm]
6–7 / 97 (123)
6)
1)
With lever (450 mm)
2)
Refer to the following charts to determine the max. door opening angle
3)
TÖW through a collision between the lever/drive and the door/frame
4)
Transom installation-opposite hinge side-link arm/reveal-max. door opening angle chart - see below
5)
Transom installation-hinge side-rail/reveal-max. door opening angle chart - see below
6)
Values in brackets at max. door opening angle 95°
Possible damage to the drive if the prescribed closing torque is not observed.
7)
If the max. door leaf thickness is exceeded, the roller guide rail must be moved
Summary of Contents for Powerturn
Page 50: ...Powerturn 50 Powerturn installation check list...
Page 51: ...Powerturn 51 Powerturn installation check list...
Page 52: ...Powerturn 52 Powerturn installation check list...
Page 53: ...Powerturn 53 Powerturn installation check list...
Page 54: ...Powerturn 54 Powerturn installation check list...
Page 55: ...Powerturn 55 Powerturn installation check list...