12. Description of Control Devices
2-9
(1) Lock levers
The lock levers lock the implement operation and the swing operation. When the left lock lever is pulled
back, the control lever stand on the left side comes up. However, when the right lock lever is pulled back,
the control lever stand on the right side does not come up.
• When leaving the operator's seat, be sure to place the buck-
et on the ground and move all lock levers to the lock posi-
tions. Keep in mind that if you should touch an unlocked
control lever inadvertently, a serious accident could occur.
• Be sure to place the lock levers securely in the lock posi-
tion. If not, they could slip out of the lock position. Thus al-
ways make sure that the lock levers are in the lock position
as illustrated in the figure at the right.
• When pulling the lock levers back, be careful not to touch a control lever.
• Remember that if the lock lever is not pulled back fully, the implement will not be locked.
IMPORTANT
This machine employs the hydraulic locking system. If the lock levers are in the lock position, all
the hydraulic cylinders for the boom, arm, bucket, boom swing and P.T.O. as well as the swing
motor and travel motors will not operate although the right and left control levers and control
pedals are free to move.
12-3. Control levers and pedals
020209-00X
(2)
(3)
(6)
(8)
(1)
(4)
(12)
(5)
(5)
(7)
(10)
(11)
(11)
(1)
(9)
Lock
(Left side)
Lock lever
020173-00E
Summary of Contents for Z17 GEN:2
Page 28: ...MEMO 1 16 Courtesy of Machine Market...
Page 40: ...MEMO 1 28 Courtesy of Machine Market...
Page 41: ...2 1 OPERATION Courtesy of Machine Market...
Page 128: ...MEMO 2 88 Courtesy of Machine Market...
Page 129: ...3 1 MAINTENANCE Courtesy of Machine Market...
Page 188: ...MEMO 3 60 Courtesy of Machine Market...
Page 189: ...4 1 SPECIFICATIONS AND DIMENSIONAL DIAGRAMS Courtesy of Machine Market...
Page 192: ...MEMO 4 4 Courtesy of Machine Market...
Page 193: ...5 1 OPTIONAL PARTS AND ATTACHMENTS Courtesy of Machine Market...
Page 196: ...MEMO 5 4 Courtesy of Machine Market...
Page 197: ...6 1 NOTES Courtesy of Machine Market...
Page 199: ...28 Maintenance Log 6 3 Date Machine hours Service performed Courtesy of Machine Market...
Page 200: ...28 Maintenance Log 6 4 Date Machine hours Service performed Courtesy of Machine Market...
Page 201: ...28 Maintenance Log 6 5 Date Machine hours Service performed Courtesy of Machine Market...
Page 202: ...6 6 29 Notes Notes Courtesy of Machine Market...
Page 203: ...29 Notes 6 7 Courtesy of Machine Market...
Page 204: ...29 Notes 6 8 Courtesy of Machine Market...
Page 205: ...29 Notes 6 9 Courtesy of Machine Market...
Page 206: ...MEMO 6 10 Courtesy of Machine Market...
Page 207: ...Courtesy of Machine Market...