17. Troubleshooting
2-83
Charging with the battery mounted on the machine
• Remove the battery cables from the positive and nega-
tive terminals of the battery before charging it. If this is
not done, abnormal voltage may be applied to the gener-
ator which could damage it.
• While charging the battery, remove all plugs to release
the gases generated by charging.
• If the battery overheats [the temperature of the electro-
lyte exceeds 113°F (45°C)], interrupt charging.
• Stop charging as soon as the process has been complet-
ed.
Overcharging could cause the following troubles:
• Overheating of the battery
• Decrease in battery electrolyte
• Battery failure
• Do not reverse polarity of the cable connections to the
battery (i.e., the negative cable to the positive terminal,
or the positive cable to the negative terminal).
Reversing the polarity of the connections will cause the
generator to be damaged.
• Handling the battery (except for checking the electrolyte
level and measuring the specific gravity of the electro-
lyte) should be performed after disconnecting the battery
cables.
Summary of Contents for Z17 GEN:2
Page 28: ...MEMO 1 16 Courtesy of Machine Market...
Page 40: ...MEMO 1 28 Courtesy of Machine Market...
Page 41: ...2 1 OPERATION Courtesy of Machine Market...
Page 128: ...MEMO 2 88 Courtesy of Machine Market...
Page 129: ...3 1 MAINTENANCE Courtesy of Machine Market...
Page 188: ...MEMO 3 60 Courtesy of Machine Market...
Page 189: ...4 1 SPECIFICATIONS AND DIMENSIONAL DIAGRAMS Courtesy of Machine Market...
Page 192: ...MEMO 4 4 Courtesy of Machine Market...
Page 193: ...5 1 OPTIONAL PARTS AND ATTACHMENTS Courtesy of Machine Market...
Page 196: ...MEMO 5 4 Courtesy of Machine Market...
Page 197: ...6 1 NOTES Courtesy of Machine Market...
Page 199: ...28 Maintenance Log 6 3 Date Machine hours Service performed Courtesy of Machine Market...
Page 200: ...28 Maintenance Log 6 4 Date Machine hours Service performed Courtesy of Machine Market...
Page 201: ...28 Maintenance Log 6 5 Date Machine hours Service performed Courtesy of Machine Market...
Page 202: ...6 6 29 Notes Notes Courtesy of Machine Market...
Page 203: ...29 Notes 6 7 Courtesy of Machine Market...
Page 204: ...29 Notes 6 8 Courtesy of Machine Market...
Page 205: ...29 Notes 6 9 Courtesy of Machine Market...
Page 206: ...MEMO 6 10 Courtesy of Machine Market...
Page 207: ...Courtesy of Machine Market...