
Ignition - Ignition system
Spark plug
cleane
On-vehicle inspection
1. Phase sensor
(a) Turn on ignition switch but do not start engine, and place digital universal meter at DC voltage gear,
then connect 2 terminals respectively to 1
#
pin and 3
#
pin of sensor, and ensure the voltage is 12V.
(b) Start engine, and phase signal is read by 2
#
pin via vehicle oscilloscope.
2. Speed Sensor
(a) Remove speed sensor joint.
(b) Place digital universal meter at ohm gear, and connect 2 terminals respectively to 2
#
pin and 3
#
pin of
sensor, and the resistance at
should be 860
1
/
2
±80
1
/
2
.
(c) Connect speed sensor joint.
(d) Place digital universal meter at AC voltage gear, and connect 2 terminals respectively to 2
#
pin and 3
#
pin of sensor, and start engine, there should be voltage output at the moment.(It is recommended to
check with vehicle oscilloscope)
Ignition
Ignition system
Inspection
1. Spark plug
(a) Clean spark plug.
Air pressure: below 588kPa.
Time: 20 s or less
(b) Check the damage condition of spark plug and insulator. If
there is something abnormal, please replace with new spark
plug.
Recommended spark plug specification:
Made in Xianghuoju Company: K6RTC
(c) Adjust electrode gap.
Electrode gap: 0.8mm
77
Summary of Contents for FC
Page 1: ......
Page 2: ......
Page 302: ...Light Side turning light Side turning light Components Side turning light 291 ...
Page 409: ...Electric glass lifter Electrical schematic diagram Electric glass lifter 398 ...
Page 412: ...Electric rearview mirror Electrical schematic diagram Electric rearview mirror 401 ...
Page 413: ...Reversing radar system Electrical schematic diagram Reversing radar system 402 ...
Page 414: ...Safety airbag system Electrical schematic diagram Safety airbag system 403 ...
Page 418: ...Combination instrument Electrical schematic diagram Combination instrument 407 ...