8
Aries Installation and Commissioning manual
Inspected
Description
Comment
ELECTRICITY:
Building fuses
Heat pump fuses
Phase sequence
Power supply
Regulation group(s)
Supply water sensor(s)
Room temperature sensor
Outdoor temperature sensor
Checked by (date)
CONTROLLER:
Room set point for the heating circuit
Heating curve gradient set
Minimum set point for supply water to the
heating circuit
Maximum set point for supply water to the
heating circuit
Checked by (date)
GENERAL:
Wiring in accordance with the installation
instructions
Connection seals
Device started up in accordance with the
instructions
Operation of the machine monitored on site
for 30 minutes
Checked by (date)
GUIDANCE FOR THE END USER:
Adding fluid to the collector
Increasing the pressure of the heating
system
Setting the heating regulation curve
App user interface guidance
Checked by (date)
Summary of Contents for Aries 12
Page 1: ...Installation and Commissioning manual Aries ground source heat p ump WWW GEBWELL COM...
Page 44: ...44 Aries Installation and Commissioning manual 18 ENERGY LABEL...
Page 46: ...OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF...
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ...OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......