INSTALLATION RECORD:
The heating system must be inspected in accordance with applicable regulations before commissioning. The inspection must
be performed by a qualified person. The installation log should be completed before the equipment is handed over to the end-
user. A completed installation log is a precondition for the validity of the warranty.
Inspected Description
Comment
COLLECTOR:
Circulation direction checked
System pressure-tested
System rinsed
System bled
Fluid quantity in the collector
Strainer checked/cleaned
Expansion tank
Initial pressure of the expansion tank (0.5 bar)
Strainer/flow direction
Safety valve checked
Shut-off valves checked
Length of the collector m
- If there are several loops, record the lengths: m
Checked by (date)
HEATING SYSTEM:
System filled
Accumulator coil filled / bled (coil
accumulator)
System pressure-tested
System rinsed
System bled
Safety valve
Diaphragm expansion tank
Initial pressure of the expansion tank
Strainer checked/cleaned
Pressure measuring device
Shut-off valves
Filling valve
Buffer accumulator
Heating circuit control set
Circulation water pumps
Rotation direction of pumps
Actuators
Checked by (date)
DOMESTIC HOT WATER:
System filled
System pressure-tested
System rinsed
Safety valve
Pressure measuring device
Buffer accumulator
Hot water circulation
Checked by (date)
Summary of Contents for Aries 12
Page 1: ...Installation and Commissioning manual Aries ground source heat p ump WWW GEBWELL COM...
Page 44: ...44 Aries Installation and Commissioning manual 18 ENERGY LABEL...
Page 46: ...OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF...
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ...OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......