1.
In idle state, the control system can be changed from PNP output to NPN
output. Remove factory-set jumpers between terminals 9 and 10, see section
“Wiring diagram for controls 24 V DC with P-logic”.
!
Firmly tighten the jumper terminals.
2.
Switch on the operating voltage.
®
Done
7.3
Checking Valve Actuation
Carry out the following steps:
1.
Check the valve functions by activating the solenoid valves using the manual
operating element on the solenoid valves: Use a screwdriver to turn the screw
(S) 0 from 0 to 1.
2.
Switch all of the solenoid valves on and off again one after the other in the
order Y1, Y2 and Y3 – if fitted.
Fig.41
®
Y1 – main actuator
®
Y2 – valve disk lifting
®
Y3 – double-disk lifting
®
Done
7.4
Service Function
If maintenance must be conducted on a process valve that is fitted with a control
top T.VIS M-15, the valve core must be pulled out of the housing. For this
purpose, the valve disk pretension of the process valve must be relieved by
actuating the main actuator. This is possible with the service function, see
“Operating overview” .
Another option with the hood removed is the manual override on the solenoid
valve, see “Control top with solenoid valves” .
7.5
Adjusting the Sensor in the Control Top
Seat Valves – Position of Sensor S1 Down
This chapter describes the adjustment of the sensor for the following valves:
Start-up
Checking Valve Actuation
430BAL010697EN_2
74
15.04.2020
Summary of Contents for T.VIS M-15
Page 6: ...430BAL010697EN_2 6 15 04 2020...
Page 53: ...Fig 27 Assembly and installation Electrical connections 430BAL010697EN_2 15 04 2020 53...
Page 55: ...Fig 28 Assembly and installation Electrical connections 430BAL010697EN_2 15 04 2020 55...
Page 119: ...Appendix 430BAL010697EN_2 15 04 2020 119...
Page 120: ......