9.5.5 Dismantling of the housing combination
Disassembly of the housing combination
Prerequisites
●
This housing combination does not exist for welded housings
1.
Remove the blanking plate (35):
1.1
Remove the clamp connection
(43) on the housing in the pipe.
1.2
Remove the blanking plate (35).
5
43
33
5
5
35
2.
Take the seat ring (33) out of the housing in the pipe
Þ
Housing combination is disassembled.
9.6 Installing the valve
9.6.1 Tightening torques
Tighten the following valve connections to the torques specified in the table.
Tightening torques
[Nm]
[lbft]
Valve disk
M14
80
59
Lantern
M34
60
44.2
Mounting base
M34
60
44.2
Blanking plate ECO-E
M34
5
3.7
INI holder
M34
Switch bar
M14
2
1.5
Clamps on the control top
1
0.7
Cap
1
0.7
9.6 Installing the valve - 61 / 106
Summary of Contents for ECOVENT N ECO Series
Page 6: ...6 106 Table of Contents 0000000576 001 EN GB...
Page 9: ...1 4 Declarations of conformity 1 4 Declarations of conformity 9 106...
Page 12: ...12 106 1 4 Declarations of conformity 0000000576 001 EN GB...
Page 20: ...20 106 2 10 Emergency measures 0000000576 001 EN GB...
Page 38: ...38 106 5 6 Electrical connection with T VIS control top 0000000576 001 EN GB...
Page 42: ...42 106 7 2 Shutdown 0000000576 001 EN GB...
Page 82: ...82 106 9 7 Maintenance 0000000576 001 EN GB...
Page 84: ...84 106 9 7 Maintenance 0000000576 001 EN GB...
Page 98: ...98 106 12 2 Spare parts lists 0000000576 001 EN GB...
Page 103: ...2 20 10 2022 221MBL003579DE_4 13 2 Dimensions sheet Actuator ECO E 103 106...