5.5 Checking the pneumatic connection
5.5.1 Air requirement
Actuator type
Actuator Ø
[mm]
Air requirement (dm
3
n
/stroke)
dm
3
n
at 1.01325 bar
at 0 °C as per DIN 1343
E_AA
85
0.13
E_BA
104
0.23
E_BB
140
0.23
E_CA
129
0.37
E_CB
129
0.37
E_CD
129
0.37
E_DD
169
0.61
E_DF
169
0.61
5.5.2 Establishing hose connections
INFO
To ensure reliable operation, the compressed air hoses must be cut exactly
at a right angle.
Tools
●
Hose cutter
1.
Shut off the compressed air supply.
2.
Use the hose cutter to cut the pneumatic hoses at a right angle.
3.
Push the air hose into the air connector on the control top.
4.
Re-open the compressed air supply.
Þ
Hose connection has been established.
5.5 Checking the pneumatic connection - 35 / 106
Summary of Contents for ECOVENT N ECO Series
Page 6: ...6 106 Table of Contents 0000000576 001 EN GB...
Page 9: ...1 4 Declarations of conformity 1 4 Declarations of conformity 9 106...
Page 12: ...12 106 1 4 Declarations of conformity 0000000576 001 EN GB...
Page 20: ...20 106 2 10 Emergency measures 0000000576 001 EN GB...
Page 38: ...38 106 5 6 Electrical connection with T VIS control top 0000000576 001 EN GB...
Page 42: ...42 106 7 2 Shutdown 0000000576 001 EN GB...
Page 82: ...82 106 9 7 Maintenance 0000000576 001 EN GB...
Page 84: ...84 106 9 7 Maintenance 0000000576 001 EN GB...
Page 98: ...98 106 12 2 Spare parts lists 0000000576 001 EN GB...
Page 103: ...2 20 10 2022 221MBL003579DE_4 13 2 Dimensions sheet Actuator ECO E 103 106...