GE
RAFT
V
OLUSON
™ P8/V
OLUSON
™P6
DIRECTION 5775469, R
EVISION
3
DRAFT (J
ULY
19, 2018)
B
ASIC
S
ERVICE
M
ANUAL
3-26
Section 3-6 - Completing the Set Up
3-6-2-2
Back End Processor Boot Up
4.) Hold down the
On/Off
button (see:
) on the control panel for ~3 seconds.
NOTE:
The mains outlet of the system for peripheral auxiliary equipment are commonly switched with the
ON/OFF
button. The power switch of any attached printer(s) needs to be in ON position before starting
the system. However, be aware some auxiliary equipment may switch itself to standby mode
(e.g., Color video printer) and must therefore be switched on separately.
When the
ON/OFF
button on the control panel is pressed, the System (including the Back-end
Processor) starts and the operating system is loaded which then leads the application software to
activate the Ultrasound unit.
The system automatically performs an initialization sequence which includes the following:
-
Loading the operating system.
-
Running a quick diagnostic check of the system.
-
Detecting connected probes
As soon as the software has been loaded, the system enters 2D-Mode with the probe and application
that were used before the system was shut down.
NOTE:
Total time used for start-up is about 2 minutes.
NOTICE
!! NOTICE:
When AC power is applied to the Ultrasound unit, the
ON/OFF
button on the control panel illuminates
amber, indicating that the System (including the Back-end Processor) is in
Standby
mode.
Figure 3-14 On/Off Button on Control Panel
On/Off Button
Summary of Contents for Voluson P8
Page 2: ......
Page 9: ...GE VOLUSON P8 VOLUSON P6 DIRECTION 5775469 REVISION 3 BASIC SERVICE MANUAL vii JA ZH CN KO...
Page 619: ......