GE
DRAFT
V
OLUSON
™ P8/V
OLUSON
™P6
DIRECTION 5775469, R
EVISION
3
DRAFT (J
ULY
19, 2018)
B
ASIC
S
ERVICE
M
ANUAL
Chapter 10 - Care & Maintenance
10-9
10-6-2
Functional Checks
The functional checks take about 60 minutes to perform.
Refer to the Voluson™ P8/Voluson™P6 Basic User Manual whenever necessary.
10-6-2-1
System Checks
NOTE:
* Some software may be considered standard depending upon system configuration.
Table 10-8 System Functional Checks
Step
Item
Description
1
B Mode
Verify basic B Mode (2D) operation.
Check the basic system controls that affect this mode of operation.
2
M Mode
Verify basic M Mode operation.
Check the basic system controls that affect this mode of operation.
3
C Mode
Verify basic CFM Mode (Color Flow Mode) operation.
Check the basic system controls that affect this mode of operation.
4
PD Mode
Verify basic PD Mode (Power Doppler Mode) operation.
Check the basic system controls that affect this mode of operation.
5
Doppler Modes
Verify basic Doppler Mode operation (PW ).
Check the basic system controls that affect this mode of operation.
6
3D Mode
Verify basic 3D Mode operation.
Check the basic system controls that affect this mode of operation.
7
RealTime 4D Mode
(optional)
Verify basic RealTime 4D Mode operation.
Check the basic system controls that affect this mode of operation.
8
*Applicable Software
Options
Verify the basic operation of all optional modes.
Check the basic system controls that affect each options operation.
9
Keyboard Test
Perform the Keyboard Test Procedure to verify that all keyboard controls are OK.
10
LCD Monitor
Verify basic LCD Monitor display functions.
11
Measurements
Scan a gray scale phantom(optional) and use the measurement controls to verify distance
and area calculation accuracy.
Refer to the Basic User Manual, for measurement accuracy specifications.
Summary of Contents for Voluson P8
Page 2: ......
Page 9: ...GE VOLUSON P8 VOLUSON P6 DIRECTION 5775469 REVISION 3 BASIC SERVICE MANUAL vii JA ZH CN KO...
Page 619: ......