D
IRECTION
5813707-100, R
EVISION
2
V
ENUE
™ S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-27
P R E L I M I N A R Y
7.) Remove the unit.
8-2-9-5
C
-FEB Heat Sync Assembly
Installation Procedure
1.) Remove the protective nylon sheet cover from the new unit.
2.) Insert the C_FEB. Note the rail on the left side.
3.) Secure the 5 screws.
4.) Connect the Fan cable and the Display Indicator (green) cable connectors.
5.) Rout the fan cable and the front display indicator cables through the left plastic clip holding and
secure the clip.
6.) Install the Fan.
7) Install C-PSB.
8.) Install back cover.
Figure 8-105 Remove the C-FEB
•
•
•
Summary of Contents for Venue Go
Page 323: ......