March 2004
1-10
Installation
Wiring the RS232 Serial
Port (cont.)
3.
Feed the flying leads end of the cable through the conduit hole and
wire the leads to the COMMUNICATION terminal block (TB4)
as shown in Figure 1-7 on page 1-13. Connect the other end of the
cable to the ANSI terminal or personal computer, and secure the
cable clamp.
4.
Tie the shield drain wire to the UTX878 ground bus bar.
!ATTENTION EUROPEAN CUSTOMERS!
To meet CE Mark requirements, all cables
must be installed as described in
Appendix B, CE Mark Compliance.
After the wiring has been completed, replace the front cover on the
enclosure and tighten the screws. Consult the user’s manual for the
external device to configure it for use with the UTX878.
What’s Next?
After the UTX878 has been completely installed and wired, reconnect
line power.
•
Check the diagnostics (discussed in Chapter 6,
Error Codes
and Diagnostics
) to ensure that the UTX878 has been properly
set up.
•
Refer to Chapter 2,
Programming Site Data
, to program the
meter for taking flow rate measurements.
Summary of Contents for UTX878 Ultrasonic
Page 2: ...iii March 2004 The UTX878 Flow Transmitter and Transducers ...
Page 8: ...Chapter 1 ...
Page 20: ...March 2004 Installation 1 11 Figure 1 5 UTX878 Outline and Installation Dwg 712 1196 rev 2 ...
Page 22: ...March 2004 Installation 1 13 Figure 1 7 UTX878 Wiring Diagram Dwg 702 528 rev 2 ...
Page 23: ...Chapter 2 ...
Page 45: ...Chapter 3 ...
Page 52: ...Chapter 4 ...
Page 60: ...Chapter 5 ...
Page 65: ...Chapter 6 ...
Page 75: ...Chapter 7 ...
Page 80: ...Appendix A ...
Page 85: ...Appendix B ...
Page 86: ...CE Mark Compliance Introduction B 1 EMC Compliance B 1 ...
Page 88: ...Appendix C ...
Page 89: ...Data Records Site Data C 1 ...
Page 93: ...Appendix D ...
Page 94: ...Service Record Introduction D 1 Data Entry D 1 Diagnostic Parameters D 3 ...