Installation
1-1
March 2004
Introduction
To ensure safe and reliable operation of the Model UTX878
Ultrasonic Flowmeter, the system must be installed and programmed
in accordance with the guidelines established by GE Panametrics’
engineers. Those guidelines, explained in detail in this chapter,
include the following topics:
•
Unpacking the Model UTX878 system
•
Selecting suitable sites for the electronics enclosure and the
transducers
•
Installing the transducers
•
Installing the electronics enclosure
•
Wiring the electronics enclosure
!WARNING!
Be sure to follow all applicable local safety codes
and regulations for installing electrical equipment.
Consult company safety personnel or local safety
authorities to verify the safety of any procedure or
practice.
!ATTENTION EUROPEAN CUSTOMERS!
To meet CE Mark requirements, all cables
must be installed as described in
Appendix B, CE Mark Compliance.
Summary of Contents for UTX878 Ultrasonic
Page 2: ...iii March 2004 The UTX878 Flow Transmitter and Transducers ...
Page 8: ...Chapter 1 ...
Page 20: ...March 2004 Installation 1 11 Figure 1 5 UTX878 Outline and Installation Dwg 712 1196 rev 2 ...
Page 22: ...March 2004 Installation 1 13 Figure 1 7 UTX878 Wiring Diagram Dwg 702 528 rev 2 ...
Page 23: ...Chapter 2 ...
Page 45: ...Chapter 3 ...
Page 52: ...Chapter 4 ...
Page 60: ...Chapter 5 ...
Page 65: ...Chapter 6 ...
Page 75: ...Chapter 7 ...
Page 80: ...Appendix A ...
Page 85: ...Appendix B ...
Page 86: ...CE Mark Compliance Introduction B 1 EMC Compliance B 1 ...
Page 88: ...Appendix C ...
Page 89: ...Data Records Site Data C 1 ...
Page 93: ...Appendix D ...
Page 94: ...Service Record Introduction D 1 Data Entry D 1 Diagnostic Parameters D 3 ...