2–4
MULTINET4 MULTI-PORT SERIAL SERVER & MANAGED SWITCH – INSTRUCTION MANUAL
GETTING STARTED
CHAPTER 2: GETTING STARTED
2.2
Unpacking
Unpack and inspect the Multinet4.
The Multinet4 is shipped with the following items in the box:
• Multinet4 unit
• Appropriate mounting brackets (19’ rail,
or
DIN rail,
or
panel), with screws
• Document CD-ROM
• Console Cable - DB9 terminations, 10' long
• Ethernet cable - RJ45 terminations, 10' long
Be sure that all the equipment you have ordered is included in the shipment.
Remove the unit from the styrofoam end caps and inspect the Multinet4 chassis for dents
or other shipping related damage. Report any damage immediately to
GE Multilin
Customer Support
and DO NOT INSTALL the unit.