© 2015 General Electric Company. All rights reserved
.
44 |
=
GE Oil & Gas
Mounting Cam Coupling
See Figure 19 on page 68 and Figure 20 on page 71.
The cam coupling (34), used on rotary actuators, is positioned on the shaft with the key engaged
in the shaft slot and the set screws (35) to the top and side. The coupling hold-down screw (32)
with the lockwasher (33) is torqued to 125 inch-lbs.
Mounting Cam
The cam holder (36) and cam (26) are positioned on the cam coupling (34) so that the desired cam
lobe’s low signal line is properly adjusted on the cam follower (4A). Proper adjustment is achieved
when:
The desired cam lobe’s low signal line is in alignment with the
raised
reference line
on the positioner (Figure 19 on page 68).
The cam is centered between the two arms of the cam lever S/A (3)
(Figure 19 on page 68).
Figure 17 Lobe Identification
Lever S/A Orientation
See “Field Mounting and Complete Calibration, Rotary Actuators” on page 51 and “Field Mount-
ing and Complete Calibration Reciprocating Valves using 87/88 Actuators ” on page 54).
The relative position of the lever S/A (3) for a selected cam lobe must be correct. The lever S/A
can be mounted with its pivot post to the left or right of the cam center.
Summary of Contents for Masoneilan 4700E
Page 4: ...This page intentionally left blank ...
Page 8: ...This page intentionally left blank ...
Page 10: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 40: ... 2015 General Electric Company All rights reserved 40 GE Oil Gas Figure 13 FM Installation ...
Page 42: ... 2015 General Electric Company All rights reserved 42 GE Oil Gas Figure 15 ATEX Installation ...
Page 46: ...This page intentionally left blank ...
Page 66: ... 2015 General Electric Company All rights reserved 66 GE Oil Gas ...
Page 78: ...This page intentionally left blank ...
Page 79: ......