Masoneilan 4700P/E & 4800P/E Positioners Manual
=
|
63
© 2015 General Electric Company. All rights reserved
.
Troubleshooting
The following conditions must exist to ensure satisfactory operation of the positioner:
The valve must be properly mounted in the line so that the actuator counters
the dynamic torque and the valve operates as desired on air failure.
Supply pressure is adequate for valve operation. See pressure drop tables in
valve catalog.
Correct positioner installation.
Correct positioning of the feedback (cam, bearing lever, etc.).
Proper cam selection.
Supply, instrument signal and output connections must be correct for the
positioner action (i.e., direct or reverse).
Air tight connections.
Correct position of the bypass.
In case of malfunction, check following in order given:
1. Check zero adjustment and adjust the zero nut (4B) if necessary. Lock with locknut
(4C).
2. Check span adjustment and adjust if necessary.
3. Adjust instrument signal pressure from minimum to maximum and observe the
corresponding gauge. If
Instrument
gauge reading does not respond to the signal,
the diaphragm S/A may be broken. Replace the defective part.
4. Positioner insensitivity may be the result of a sticking pilot spool whose movement
may be impeded by:
a. Foreign matter such as dirt, metal particles, etc.
b. Partial blockage of air passages caused by too much oil in the air lines.
c. Blocking of vent holes.
Summary of Contents for Masoneilan 4700E
Page 4: ...This page intentionally left blank ...
Page 8: ...This page intentionally left blank ...
Page 10: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 40: ... 2015 General Electric Company All rights reserved 40 GE Oil Gas Figure 13 FM Installation ...
Page 42: ... 2015 General Electric Company All rights reserved 42 GE Oil Gas Figure 15 ATEX Installation ...
Page 46: ...This page intentionally left blank ...
Page 66: ... 2015 General Electric Company All rights reserved 66 GE Oil Gas ...
Page 78: ...This page intentionally left blank ...
Page 79: ......