Masoneilan 4700P/E & 4800P/E Positioners Manual
=
|
43
© 2015 General Electric Company. All rights reserved
.
Split Range Operation
Split ranging permits operation of two valves in sequence from one 4-20 mA control signal. To
accomplish this with the 4700E/4800E, the two positioners are connected in series as shown in
Figure 16, with the actual split ranging done by proper cam segment selection per tables in “Cam
Lobe Selection and Lever Arm Orientation” on page 65.
NOTE
With this configuration, the voltage burden of the 4-20 mA
controller is 10 V instead of 5 V.
Figure 16 Split Range
Summary of Contents for Masoneilan 4700E
Page 4: ...This page intentionally left blank ...
Page 8: ...This page intentionally left blank ...
Page 10: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 40: ... 2015 General Electric Company All rights reserved 40 GE Oil Gas Figure 13 FM Installation ...
Page 42: ... 2015 General Electric Company All rights reserved 42 GE Oil Gas Figure 15 ATEX Installation ...
Page 46: ...This page intentionally left blank ...
Page 66: ... 2015 General Electric Company All rights reserved 66 GE Oil Gas ...
Page 78: ...This page intentionally left blank ...
Page 79: ......