2018111-336 Rev. B
eBike III basic / comfort
- 53 -
2
1
s
traIn
gauge
Module
exCHange
1. Follow the steps in
“Remove housing of the eBike III basic“ on page 42
or
“Remove housing of the eBike III comfort“ on page
46.
2. Disconnect the cable of the strain gauge module from
the LIU electronics (the electronic housing is located
underneath the bottom plate).
Remove the toroid ferrite off the cable.
3. Remove the two allen screws securing the strain
gauge module.
4. Remove the strain gauge module (1) and the heat sink
(2) and carefully pull the cable through the hole in the
bottom plate.
5. When installing the new module carefully allign the
module and the heat sink in parallel to the eddy
current brake.
6. When securing the module in place, carefully tighten
the two screws; excessive force may damage the
module.
7. Lead the connecting cable through the hole in the
bottom plate.
Lead the cable through the toroid ferrite and
reconnect it to the LIU electronic board.
Summary of Contents for eBike III basic Series
Page 2: ......