![GAYLORD RSPC-ESP-OW Series Technical Manual Download Page 110](http://html.mh-extra.com/html/gaylord/rspc-esp-ow-series/rspc-esp-ow-series_technical-manual_570442110.webp)
Appendix A – Receiving, Rigging and Storage, Page A-2__________________________________________
Rigging
Instructions
All units are provided with a minimum of four (4) lifting points for rigging attachment. WARNING: Use all
lifting points provided (Refer to Figure A-2-1). Spreader bars are mandatory to prevent contact and
damage to the unit by lifting hooks, straps, cables, or chains. Consult the mechanical or structural engineer
before moving the unit across the roof deck.
Spreader Bar
Lifting Point (4)
Figure A-2-1
Typical Rigging