
EN
27
Installation Instructions
Example of installation – Data Link, direct connection between wallboxes
Example of installation – Data Link, permitted connection via external junction boxes
(figure 27)
(figure 28)
0000.0
GLB Wi-Fi
GLB Standard
GLB Standard
GLB Standard
GLB Standard
Data Link
Data Link
Data Link
Data Link
MASTER
SLAVE
SLAVE
SLAVE
SLAVE
DataLink
E-Meter
Remote control
A -
B +
A -
B +
Distribution box
Address 100
Twisted pair
Cable: Suitable for modbus
communication
Wallbox 1
Wallbox 2
Wallbox 3
Wallbox 4
Wallbox 5
Twisted
pair
Junctionbox
Junctionbox
Junctionbox
Junctionbox
GLB
Wi-Fi
GLB
Standard
Data Link
Data Link
Data Link
Data Link
0000.0
GLB Standard
GLB Standard
GLB Standard
MASTER
SLAVE
SLAVE
SLAVE
SLAVE
DataLink
E-Meter
Remote control
A -
B +
A -
B +
There must always be one (1pcs) GLB wallbox as “Master” in the installation and it is set by SW1
DIP5. All other boxes should be slaves and this is set by SW1 DIP6, see picture 27.
SW1 (DIP 5 and 6) settings
(figure 29)
Installationen ska utföras enligt bild 28 eller bild 29.