
EN
13
Installation Instructions
ON OFF
SW2
Depending on the size of the fuse, overload
may occur, primarily at the property’s meter
fuse. The wallbox’s charging current can be
reduced using the switches on the mainboard
(refer to Mainboard simplified connection
diagram (figure 9).
The power supply must be turned off before
setting of the DIP switches
(figure 8)
Dip Switch settings table
(figure 9)
Main fuse
16A
20A
25A
32A
40A
50A
63A
SW1(DIP 1-3)
16A
20A
25A
32A
40A
50A
63A
SW2(DIP 1-3)
MAX13A MAX16A MAX20A MAX25A MAX32A MAX32A MAX32A