
EN
10
Installation Instructions
1.
Read Safety information. The installation must be carried out by an authorized installer.
2.
Select the appropriate group fuse (1x16A - 3x32A) and cable area for the electrical
installation. Some countries require earth fault breakers to be installed. Follow local country
regulations and select the appropriate earth fault equipment for the electrical installation.
NOTE! Due to high currents for a long time in the cable, there is a high risk of voltage drop if
the cable is under-dimensioned which can damage the electronics in an EV.
3.
Fill in the fuse and cable information in the Warranty form located in the installation manual
that is included in the box.
4.
Mount the GLB Wallbox according to the installation sketches. There is a drill template at the
back side of the box.
(figure 3)
Step-by-Step Guide
(figure 4)
(7 x T20)