NOTE
To make a DLM work, all units in the DLM must be part
of a structured communication group. In small
installations, only 1 internet gateway/communication
master is required.
5. Enter a group name and set the maximum current
(Ampere) for the group.
This is also required for a single charging station
installation. If a charging station is only installed to
act as an internet gateway, that is create internet
access and net access, then this group size can be
set to the maximum current of the charging station.
In such an instance, the group is never used for any
direct DLM function.
If the first created group is to be used as an active
DLM group, then it is recommended that the actual
DLM current limit is entered.
6. An installation guide opens and shows the required
steps to install the unit.
All steps must be completed
to finalize the installation.
7. Configuration.
a. Install the charging station(s). Refer to
b. Scan the QR code on the bracket.
If the QR cannot be scanned, manually enter the ID.
74
Version: 1.3
Summary of Contents for ENTITY PRO
Page 4: ......
Page 8: ......
Page 10: ......
Page 18: ......
Page 48: ...100A LI 1 LI 2 48 Version 1 3 Installation...
Page 100: ......
Page 101: ...EU DECLARATION OF CONFORMITY Version 1 3 101 EU Declaration of conformity...
Page 102: ...102 Version 1 3 EU Declaration of conformity...