NOTE
If the charging station needs manual internet settings,
that is if it shall act as a master with a local Wi-Fi as the
internet connection, make the internet connectivity
settings in the GARO Connect app. Refer to
the installation (installer), page 68
.
4.12.15 TO DO A FINAL FUNCTIONALITY TEST OF
THE PRODUCT
CAUTION
If the charging unit needs reduced installed current
settings, make sure that this setting is done before
testing with high power, such as EV charging.
1. Switch the power/voltage to off.
2. Do a test of the PE continuity to the Type 2 outlet.
3. Switch the power/voltage to on.
4. After the power/voltage is switched on, the
charging station will start up. This can take up to 90
seconds. Progress is indicated by red LED segments
on the indication light. A fixed green light indicates
when the charging station is ready, given that the
all-pole breaker is ON. If it is not, then the light will
be red.
I ON
I ON
I ON
I ON
O OFF
O OFF
O OFF
O OFF
Version: 1.3
41
Summary of Contents for ENTITY PRO
Page 4: ......
Page 8: ......
Page 10: ......
Page 18: ......
Page 48: ...100A LI 1 LI 2 48 Version 1 3 Installation...
Page 100: ......
Page 101: ...EU DECLARATION OF CONFORMITY Version 1 3 101 EU Declaration of conformity...
Page 102: ...102 Version 1 3 EU Declaration of conformity...