4. Switch the power/voltage to on.
5. Do a check of the voltage and phase sequence in
the installation bracket terminal. Make sure that the
voltage and phase sequence matches the planned
setup. Refer to
4.12.5 To connect the power cable
.
6. Switch the power/voltage to off.
7. Read the QR code on the installation bracket using
the Gar Connect App. At this step, it is time to
connect the charging station, created in the GARO
Connect App to the physical installation bracket.
Refer to
for more
information about the procedure and functions of
the GARO Connect app.
O OFF
O OFF
O OFF
O OFF
I ON
I ON
I ON
I ON
34
Summary of Contents for ENTITY PRO
Page 1: ...GAROEntityProinstallationand operation GARO Entity Pro installation and operation...
Page 4: ......
Page 8: ......
Page 10: ......
Page 74: ......
Page 84: ......
Page 90: ......
Page 91: ...EC DECLARATION OF CONFORMITY 91 EC Declaration of conformity...