3.4
CHARGING STATION OVERVIEW
A. Power connection terminal (in and out).
B. Bracket terminal connector.
C. Charging unit connector.
D. Installation bracket QR label.
E. Ethernet cable inlet.
F. Control cable inlet.
G. Visible MID energy meter (optional).
H. All-pole circuit breaker, manual reset.
I. PE disconnection relay (PME protection variant only)
(for UK only).
J. 2 port Ethernet switch RJ45.
K. Control cable port and connector.
L. SIM card slot (size 3 FF/Micro).
M. Flat adapter cover.
1
R
D
B
E
A
F
T
O
H
I
R
D
N
S
C
K
L
J
M
G
P
Q
15
1.
The fixed cable variant of the charging unit has the fixed cable placed here.
Summary of Contents for ENTITY PRO
Page 1: ...GAROEntityProinstallationand operation GARO Entity Pro installation and operation...
Page 4: ......
Page 8: ......
Page 10: ......
Page 74: ......
Page 84: ......
Page 90: ......
Page 91: ...EC DECLARATION OF CONFORMITY 91 EC Declaration of conformity...