4. Install the load interface unit (C) on the DIN rail.
5. Dismantle the wires and connect the Load interface
to the 230V AC. (Refer to the electrical schedule for
all electrical connections.)
6. Connect the Load interface to the protection device.
7. If current is measured using current transformer,
choose the correct current transformer (CT) for the
installation.
2-pole
2-10 A
L
N
PE
8 mm
Max 1,5 mm²
69