NOTE
The cable strain relief can be configured in 3 different
ways. Choose the configuration that is suitable for the
diameter of the power cable.
5. Cut the wires to the exact length for the installation.
6. Cut and dismantle the wires. Use a wire ferrule (A)
for strained power wire conductors (B).
CAUTION
Make sure that the protective earth cable is a little bit
longer than the other cables.
4.12.5
TO CONNECT THE POWER CABLE TO THE
TERMINAL
Electric vehicles charge on one, (two) or three phases.
Phase loads must be addressed, especially when
installing several charging stations in one location.
GARO Entity PRO is available with a built-in phase
management system, that when using DLM,
automatically selects the phase(s) that can be used. This
means, that the charging stations involved can be
installed as L1 to L1, L2 to L2 and L3 to L3.
If charging units without this function are used, it is
highly recommended to rotate phases one step for each
charging station. The rotation must also be configured
in the GARO connect app to reflect exactly how each
charging station is connected to the grid.
Install the power lines as follows:
1. Install the wires of the power cable according to
installation type.
12 - 17 mm
15 - 20 mm
18 - 24 mm
TX20
18 mm
A
B
28
Summary of Contents for ENTITY PRO
Page 1: ...GAROEntityProinstallationand operation GARO Entity Pro installation and operation...
Page 4: ......
Page 8: ......
Page 10: ......
Page 74: ......
Page 84: ......
Page 90: ......
Page 91: ...EC DECLARATION OF CONFORMITY 91 EC Declaration of conformity...