Step 8: Top Flashing Weatherization and Shingle Integration
Follow these 5 substeps to complete the top flashing weatherization & shingle integration. These steps
should follow roofing industry best practices:
Step 8a: Install the QuickStart® Peel & Stick Starter Roll over the Top Corner Flashing...
Install a
strip of QuickStart® Peel & Stick Starter Roll or leak barrier over the top corner flashing as
shown in Figure 65.
Step 8b: Apply Shingles over the Top Corner Flashing…
It may be required to notch the corner shingle
transitioning from the side of the array to the top flashing (Figure 66).
Step 8c:
Install the Leak Barrier over the Row of Top Flashings…
Install the leak barrier over the nailing
area of the top flashing. This ensures that nail penetrations are sealed from any possible water
Step 8a: Install the
QuickStart® Peel & Stick
Starter Roll over the Top
Corner Flashing
Step 8b: Apply
Shingles over the
Top Corner
Flashing
Step 8c: Install
the Leak Barrier
over the row of
Top Flashings
Step 8d: Roll out
the QuickStart®
Peel & Stick
Starter Roll over
the Leak Barrier
Step 8e: Shingle
around the Top
Flashing
Figure 65: Apply a strip of QuickS tart® Peel & S tick S tarter Roll at the Top Corner Flashing
Top Corner
Flashing
QuickStart® Peel &
Stick Starter Roll or
leak barrier. Notch as
needed.
Notch the Shingle
as needed
Figure 66: S hingling at the corner of the S olar Array