P a g e
|
11
Step Flashing [SKU 2947305]
Inner Top Flashing [SKU 2947309]
Top Flashing Grounding Components
DynoRaxx® DynoBond™ Grounding Clip
[SKU 2947602]
S-8 Split-Bolt Connector [SKU 2947509]
Besides the aforementioned parts,
the installer
is expected to stock the following materials:
•
Standard PV & roofing tools (see page 18 for the list of tools)
•
Roll of bare solid copper grounding wire, #10 or #12 AWG
•
Roll of PV wire for the home run wire
•
PV connectors for the home run wire
•
Roofing materials
o
VersaShield® SOLO™ Fire-Resistant Slip Sheet
o
QuickStart® Peel & Stick Starter Roll (If it is unavailable locally, the installer could use Pro-
Start® Starter Strip Shingles and asphaltic plastic cement. The asphaltic plastic cement
should conform to ASTM D4586 Type I or II.)
o
StormGuard®
Film-Surfaced Leak Barrier
o
Shingles
o
Drip edge
o
Shims
o
Drill-Tec™ #14 – 2" (51 mm) Heavy Duty Roofing Fasteners
o
Cap nails/staples
The electrician
is expected to stock the following
•
Standard electrical tools
•
Conduits & conduit supports
•
Safety labels
•
Combiner box and AC/DC disconnects
Note: The DecoTech™ RI 2000 can be integrated with a DC power optimizer or an AC microinverter.
Depending on the type of MLPE, additional electrical components (inverters, monitoring systems, cables,
connectors) & tools would also be required in the field. The DC power optimizer or the AC microinverter
must be installed according to the MLPE manufacturer’s installation instruction.
Table 1: DecoTech™ S olar S ystem Parts