2. WIRING
2-12
• Signal cable (from distributor unit): Connect the power and signal lines, and fix the
cable on the conductive tape with the clamp in the transceiver unit. Then tighten the
cable with the SC lock.
• Transducer cable: Connect the signal and shield lines, and fix the cable on the con-
ductive tape with the clamp in the transceiver unit. Then tighten the cable with the
SC lock.
2.6
Junction Box (option)
The transducer cable is connected to the junction box with an extension cable. After
making the connection, seal the cable gland with putty for watertightness.
2.6.1
How to fabricate the cable
Before cable fabrication, attach the cable glands and gaskets which are attached at
the cable entrance on the cable in advance. Please pay attention to the orientation of
cable glands and gaskets on the cable.
Transducer
cable
Signal cable
(From distributor unit)
Shield
Clamp
Clamp
SC lock
SC lock
Terminal for power
Inner sheath
Inner sheath
Cut to suitable length
considering location on
terminal board.
Insulation tube
FV2-P4
FV5.5-5
FV1.25-4
To internal earth stud
Vinyl tape
See interconnection
diagram.
Gland
Gasket
Summary of Contents for DS-8500
Page 81: ...D 1 28 Sep 2019 H MAKI ...
Page 82: ...D 2 28 Sep 2019 H MAKI ...
Page 83: ...D 3 29 Oct 2019 H MAKI ...
Page 84: ...D 4 18 Feb 2020 H MAKI ...
Page 85: ...D 5 3 Apr 2020 H MAKI ...
Page 86: ...D 6 6 Apr 2020 H MAKI ...
Page 87: ...D 7 2 Apr 2020 H MAKI ...
Page 88: ...D 8 ...
Page 89: ...D 9 ...
Page 90: ...D 10 ...
Page 91: ...D 11 17 Nov 2016 H MAKI ...
Page 92: ...D 12 25 May 2011 Y NISHIYAMA ...
Page 93: ...D 13 15 May 2020 H MAKI ...