![Furuno DS-8500 Installation Manual Download Page 24](http://html.mh-extra.com/html/furuno/ds-8500/ds-8500_installation-manual_2349987024.webp)
1. MOUNTING
1-18
10. Remove the Jubilee clip located at the base of the transducer (1) cable and four
M4 flat-head Phillips screws at the top side of the transducer (1).
11. Pass the transducer cable through the shaft from the flange side.
12. Apply the Liquid Gasket TB1121 to the top side of the transducer evenly.
13. Apply the Liquid Gasket TB1121 to the thread part of hex. bolt (15) with seal wash-
er (16) and use them to fasten the transducer.
Check that the fore mark on the shaft is aligned with the projection at the bottom
of the transducer.
14. Pass the flat washer (8), gasket (7), washer (8), and the gland (19) onto the trans-
ducer cable.
Jubilee clip
Jubilee clip
Do not remove
this screw.
Remove these
four screws.
Removing Jubilee clip
Removing flat-head Phillips screws
The fore mark on the shaft
Align them.
The projection on the transducer
Bottom view
Summary of Contents for DS-8500
Page 81: ...D 1 28 Sep 2019 H MAKI ...
Page 82: ...D 2 28 Sep 2019 H MAKI ...
Page 83: ...D 3 29 Oct 2019 H MAKI ...
Page 84: ...D 4 18 Feb 2020 H MAKI ...
Page 85: ...D 5 3 Apr 2020 H MAKI ...
Page 86: ...D 6 6 Apr 2020 H MAKI ...
Page 87: ...D 7 2 Apr 2020 H MAKI ...
Page 88: ...D 8 ...
Page 89: ...D 9 ...
Page 90: ...D 10 ...
Page 91: ...D 11 17 Nov 2016 H MAKI ...
Page 92: ...D 12 25 May 2011 Y NISHIYAMA ...
Page 93: ...D 13 15 May 2020 H MAKI ...