Operating Instructions
7-7
X screens are zoomed up.
The fibers are inspected for axis offset and cleave condition.
The cores of the fibers are aligned on the X and Y view
screens.
The electrodes discharge.
The splice is inspected.
The splice loss is estimated and displayed on the LCD
monitor as shown in the picture.
4. While in Pause status, pressing Menu key displays options available in the process. To
resume the process, press
again.
Summary of Contents for S153 Ver.2
Page 2: ......
Page 8: ......
Page 22: ......
Page 28: ......
Page 40: ...External Description 5 2 Electrode V Groove Fiber Holder Fiber Clamp ...
Page 50: ......
Page 99: ...Programming Guide 8 21 Time chart of heater parameters ...
Page 152: ......