INSTALLATION
VSRT-IOM-2022-0728
SECTION 2
wiring through the appropriate conduit runs. Electrical wires are labeled
for easy landing. Connect all wiring per the Fulton supplied electrical
drawings.
9. If a header is supplied, mount the header as shown in the mechanical
drawing.
NOTE:
For piping supplied in sections, make up and connect hand tight until all
sections are in place to ensure sections align properly. Sections are match marked
for reassembly.
10. Tighten all connections, including threaded and flanged factory
connections which may loosen during shipment.
11. Pneumatically test the piping (at 15 psig [103 kPa] maximum) prior to
filling the systems.
12. Check bolts and connections for tightness after the first heat up cycle.
Retorquing may be required.
Before Leaving the Installation
Before leaving the installation, adhere to the following:
1. Check all controls to ensure they are operating properly.
2. Cycle the boiler several times.
3. Make sure the installation complies with all applicable codes.
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.