U41621-J-Z156-1-76
39
Installing the Server
Connecting and Disconnecting Cables
Figure 11: Cabling two nodes
Ê
Connect the SMP Expansion cables to node 1:
Ê
Connect one end of an SMP Expansion cable to port 1 on node 1; then,
route the cable through the node 1 cable-management arm. Use a 2.3-
m (7.6-foot) SMP Expansion cable for this connection.
Ê
Connect one end of an SMP Expansion cable to port 2 on node 1; then,
route the cable through the node 1 cable-management arm. Use a 2.3-
m (7.6-foot) SMP Expansion cable for this connection.
Ê
Connect the SMP Expansion cables to node 2:
Ê
Locate the SMP Expansion cable that is connected to port 1 on node 1;
then, connect the opposite end of the cable to port 1 of node 2. Next,
route the cable through the node 2 cable-management arm.
Ê
Locate the SMP Expansion cable that is connected to port 2 on node 1;
then, connect the opposite end of the cable to port 2 of node 2. Next,
route the cable through the node 2 cable-management arm.
Ê
Route any remaining cables through the cable-management arms.